U.S. refinery shutdowns - Valero, Exxon, Sunoco, BP

Related Topics

Quotes

   

Tue Jul 31, 2012 9:49pm BST

 July 27 (Reuters) - Summary of current U.S. refinery operations (in '000 bpd)
-Valero plans turnaround at Texas, Canada refineries in Q1 
-Valero: Gulf Coast hydrocracker projects delayed 
-Exxon warns of flaring at Torrance, Calif. refinery 
-Valero expects Benicia FCC to be back in service by mid-August 
-Valero sees Meraux refinery to be back by end of August 
-Sunoco to restart Philadelphia gasoline unit Tuesday-source 
-Valero updates on Q3, Q4 refinery turnaround schedule 
-BP says Whiting crude unit to come offline as part of upgrade 
-Valero says Port Arthur refinery to reach full rates in Q4 
-BP reports process unit trip at Cherry Point, WA, refinery 
-Exxon: Maintenance finished at California refinery 
-Citgo sees output impact at Lemont from Enbridge pipeline outage 
-Citgo Lemont, IL, refinery FCC shut for repairs after upset 
-PBF restarted boiler at Delaware refinery 
-Exxon says Baytown refinery operations normal after unit snag 
-Motiva reports cat cracker upset at Norco refinery 
-Exxon reports HCU snag at Baytown refinery 
================================================================================================
ECONOMIC RATE CUT ANNOUNCEMENTS
================================================================================================
Company       Location/Units Affected   Amount of Cut        Timing       Link
************************************************************************************************
FLINTHILLS    North Pole, AK            140                  Apr 11, 2012 
HOVENSA       St. Croix, US VI          350                  Feb 21, 2012 
PHILLIPS 66   Trainer, PA               185                  Indefinite    
SUNOCO        Eagle Point, NJ           145                  Permanent  
           Marcus Hook, PA           178                  Indefinite   
VALERO        Aruba                     235                  Mar 29, 2012 
           Corpus Christi, TX/FCC                                      
================================================================================================
REFINERY SHUTDOWNS
================================================================================================
Company    Location          Units          Cap.   Timing       Reason/Notes     Link
 EAST COAST
*****************************************2012 Q3************************************************
 
PBF        Delaware City,DE  Boiler         182.2  Jul 30       Restarted       
                          Boiler                Jul 27       Failure         
                          Refinery              Jul 23       Rail capacity   
SUNOCO     Philadelphia, PA  FCC            330    Jul 31       Restart         
                          FCC                   Jul 27       Shutdown        
 
                          FCCU                  Jul 23       Down for work   
                          Alky unit             Jul 23       Planned work    
                          Gasoline unit         Jul 23       Restart         
                            
================================================================================================
 GULF COAST
*****************************************2012 Q3************************************************
ALON       Big Spring, TX    Refinery        67    Jul 26       Compressor trip 
BP         Texas City, TX    FCCU           406    Jul 26       Snag            
                          Ultraformer           Jul 23       To resume ops   
CITGO      Corpus Christi,   Refinery       163    Jul 19       Units back       
EXXON      Baytown, TX      HCU            560.6  Jul 30       Ops normal       ID:nWNAB8907]  
                          HCU                   Jul 30       Upset           
FLINT      Corpus Christi,   Alky unit      290    Jul 25       Unit stable     
                          Refinery              Jul 24       Benzene leak    
HILLS            TX                                   Jul 23       Unit snag      
 
MARATHON   Garyville, LA     HCU, CDU              Nov 2012     Expansion       
MOTIVA     Norco, LA         FCC            233.5  Jul 30       Upset           
PETROBRAS  Pasadena, TX      Refinery       100    Jul 20       Planned rates   
 
VALERO     Corpus Christi,TX Refinery       142    Jul 31       Q1 2013 work    
                          SRU                   Jul 24       Incinerator down  
 
                          Refinery              Jul 20       Planned rates   
        Houston, TC       FCC             88    Jul 31       Overhaul        
        Meraux, LA        Refinery       125    Jul 31       End-Aug restart [ID:nWNAB9375 ]
                          Refinery       125    Jul 23       All units shut  
                                                Jul 22       Fire            
        Norco, LA         HCU            205    Jul 31       Delayed         
        Port Arthur, TX   HCU            290    Jul 31       Delayed         
                          HCU                   Jul 31       Full rates 4Q   
                          Refinery              Jul 27       Work underway   
                          SRU                   Jul 24       Restarted       
        Texas City, TX    Refinery       225    Jul 31       Q1 2013 work    
WESTERN    El Paso, TX       Refinery       122    2013         Turnaround      
                                                2014         Turnaround      
================================================================================================
 MIDCONTINENT
*****************************************2012 Q3************************************************
BP         Whiting, IN       FCC            337    Jul 31       Offline in 4Q   
                          Coker                 Jul 27       Restart 2-4 wk  
                          Refinery              Jul 24       Brief fire      
                                                Jul 24       Coker outage    
BP-HUSKY   Toledo, OH        Refinery       160    Sep 2012     Turnaround      
CITGO      Lemont, IL        Refinery       167    Jul 30       Output impact   
                          FCC                   Jul 30       Shut for repair  
     
CVR ENERGY Wynnewood, OK     Refinery        70    Q4 2012      Turnaround      
  
EXXON      Joliet, IL        Refinery       238.6  Jul 22       Equipment upset 
                                                
HOLLY-     Tulsa, OK         Refinery       155.3  2H 2012      Turnaround      
FRONTIER
HUSKY      Lima, OH          Refinery       155    Jul 24       Normal ops      
        
MARATHON   Detroit, MI       Refinery       106    Q3 2012      Turnaround      
PHILLIPS66 Woodriver, IL     Refinery       362    Jul 30       Compressor trip 
TESORO     Mandan, ND        Refinery        60    End-Q2       Expansion        
 

===============================================================================================
 ROCKY MOUNTAINS
*****************************************2012 Q3************************************************
HOLLY-     Wood Cross, UT    FCC                   2H 2012      Turnaround       
    
FRONTIER                     Refinery        31    Future       Expansion        
                          Refinery              2012-2014    Expansion        
SINCLAIR   Sinclair, WY      Refinery        74    Jul 25       Restart units    
================================================================================================
 WEST COAST
*****************************************2012 Q3********************************************
Comments (0)
This discussion is now closed. We welcome comments on our articles for a limited period after their publication.