TABLE-Gas liquefaction terminal projects
LONDON, Sept. 24 (Reuters) - Below is a list of the world's operational and planned gas liquefaction terminals. Country Terminal Location Capacity Capacity Status Start
(mln tonnes/yr) (bcm/yr) Algeria
Skikda GL1 KII 3.1 4.3 Existing 1972
Skikda Skikda 4.5 6.1 Engineering 2011
Arzew GL4Z Arzew 1.1 1.5 Existing 1964
Arzew GL1Z Arzew 8.2 11.2 Existing 1978
Arzew GL2Z Arzew 8.0 10.9 Existing 1981
Gassi Touil Arzew 4.0 5.4 Engineering 2012 Angola
Angola LNG Soyo 5.0 6.8 Planned 2011 Australia
NW Shelf 1-4 Burrup Peninsula 11.9 16.2 Existing 1989
NW Shelf 5 Burrup Peninsula 4.4 6.0 Construction 2008
Darwin LNG Point Wickham 3.7 5.0 Existing 2006
Pluto Burrup Peninsula 6.0 8.2 Engineering 2010
Gorgon Barrow Island 10.0 13.6 Engineering 2011
Ichthys Kimberly 6.0 8.2 Engineering 2012 Brunei
Brunei LNG Lumut 7.2 9.8 Existing 1972 Egypt
Segas Damietta 4.8 6.5 Existing 2005
Segas Train 2 5.3 7.2 Planned 2011
Egyptian LNG1 Idku 3.6 4.9 Existing 2005
Egyptian LNG2 Idku 3.6 4.9 Existing 2005
Egyptian LNG3 Idku 3.6 4.9 Planned 2011 Equatorial Guinea EG LNG Bioko Island 3.4 4.6 Construction 2007
EG LNG 2 Bioko Island 4.4 6.0 Planned 2012 Indonesia
Bontang East Kalimantan 22.3 30.3 Existing 1977
Arun North Sumatra 6.8 9.3 Existing 1978
Tangguh Bintuni, Papua 7.6 10.3 Construction 2008
Donggi Central Sulawesi 2.0 2.7 Planned 2012 Iran
Pars LNG 10.0 13.6 Planned 2011
Persian LNG 8.0 10.9 Planned 2012
Iran LNG Bandar Tombak 9.0 12.2 Planned 2012 Libya
Marsa el Brega 0.8 1.0 Existing 1970
Marsa el Brega 2.4 3.3 Planned 2010 Malaysia
MLNG Bintulu, Sarawak 8.1 11.0 Existing 1983
MLNG Dua Bintulu, Sarawak 7.8 10.6 Existing 1995
MLNG Tiga Bintulu, Sarawak 6.8 9.3 Existing 2003
Nigeria
NLNG 1-2 Bonny Island 6.6 9.0 Existing 1999
NLNG Train 3 Bonny Island 3.3 4.5 Existing 2002
NLNG Plus 4-5 Bonny Island 8.2 11.2 Existing 2006
NLNG Train 6 Bonny Island 4.1 5.6 Construction 2007
NLNG Seven+T7 Bonny Island 8.0 10.9 Engineering 2011
Brass LNG Baylesa 10.0 13.6 Engineering 2011
Olokola LNG Olokola 11.0 15.0 Engineering 2011 Norway
Snøhvit Melkoya Island 4.1 5.6 Construction 2007 Oman
Oman LNG Qalhat 7.2 9.8 Existing 2000
Qalhat LNG Qalhat 3.6 4.9 Existing 2005 Peru
Peru LNG Pampa Melchorita 4.4 6.0 Construction 2010 Qatar
Qatargas Ras Laffan 9.9 13.5 Existing 1997
Qatargas II (Train 4) 7.8 10.6 Construction 2008
Qatargas II (Tr 5) 7.8 10.6 Construction 2008
Qatargas III (Tr 6) 7.8 10.6 Construction 2009
Qatargas IV (Tr 7) 7.8 10.6 Construction 2010
RasGas Ras Laffan 6.6 9.0 Existing 1999
RasGas II (Tr 3-4) 9.4 12.8 Existing 2004
RasGas II (Tr 5) 4.7 6.4 Existing 2007
RasGas III (Tr 6) 7.8 10.6 Construction 2008
RasGas III (Tr 7) 7.8 10.6 Construction 2009 Russia
Sakhalin II Prigorodnoye 9.6 13.1 Construction 2008
Baltic LNG Ust-Luga 5.3 7.2 Planned 2010
Shtokman LNG Murmansk 15.0 20.4 Planned 2015
Trinidad
Atlantic LNG Point Fortin 3.3 4.5 Existing 1999
Atlantic T2/3 6.6 9.0 Existing 2002
Atlantic T4 Point Fortin 5.2 7.1 Existing 2005
Atlantic T5 5.2 7.1 Planned 2010 UAE Adgas Das Island 5.8 7.9 Existing 1977 United Kenai LNG Alaska, States Cook Inlet 1.5 2.0 Existing 1969 Venezuela
Plataforma Deltana 4.7 6.4 Planned 2010+ Yemen
Yemen LNG 1 Bal Haf 3.4 4.6 Construction 2008
Yemen LNG 2 Bal Haf 3.4 4.6 Construction 2009
Capacity Capacity
(mln mt/yr) (bcm/yr) Total Existing 189.7 258.1
Planned + Existing 420.3 571.8
Source: International Energy Agency/Reuters.
© Thomson Reuters 2009 All rights reserved.

UK
US