UPDATE 1-Shell resumes output at Nigerian EA oilfield
(Updates with Shell confirmation)
ABUJA, Nov 11 (Reuters) - Royal Dutch Shell (RDSa.L) has restarted operations at its 115,000 barrels per day EA oilfield in Nigeria, two months after it was shut down for repairs, a company spokeswoman said on Wednesday.
Production was suspended in early September to repair a floating production storage and offloading unit supporting the EA oilfield.
"We can confirm production from the EA oilfield has resumed on the 8th of November and is ramping up," said Shell spokeswoman Caroline Wittgen. (Reporting by Randy Fabi; Editing by Keiron Henderson)
© Thomson Reuters 2009 All rights reserved.

UK
US