TABLE-U.S. oil refinery expansion plans
-------------------------------------------------------------------------------------
MOTIVAENTERPRISES LLC (RDSa.L) [ID:nN23314144]
Pt. Arthur, TX 45,000 bpd DHT 2008 Construction began June 2006
325,000 bpd Refinery 2010 $7 bln project approved ------------------------------------------------------------------------------------- PASADENA REFINING SYSTEM INC. Pasadena, TX N/A Refinery 2010 Revamp to run 70,000 bpd Marlim
N/A CDU N/A Future 100-200,000 bpd expansion ------------------------------------------------------------------------------------- PLACID REFINING COMPANY LLC Port Allen, LA N/A FCC Q2-08 Gasoline output to rise 7,000 bpd
N/A CDU Q3-08 Heavy oil revamp
25,000 bpd CDU N/A Planned expansion
-------------------------------------------------------------------------------------
TOTAL SA (TOTF.PA) [ID:nL13709737]
Pt. Arthur, TX 50,000 bpd DCU 2011 $2.2 bln heavy oil project
N/A HDS 2011 N/A
VDU 2011
-------------------------------------------------------------------------------------
VALERO ENERGY CORPORATION (VLO.N)
Pt. Arthur, TX 75,000 bpd CDU 2010 Crude throughput expansion
45,000 bpd DCU 2011 New coker
50,000 bpd HCU 2010 New diesel hydrocracker
N/A CGU 2012 $2.5 bln coke gasification unit St Charles, LA 45,000 bpd CDU 2010 $1.4 bln, board approved
10,000 bpd DCU 2010 Coker expansion
50,000 bpd HCU 2010 New hydrocracker
N/A Aromatics 2012* Proposed $2.1 bln aromatics plant
that would cut mogas output ------------------------------------------------------------------------------------- WRB REFINING (ConocoPhillips and EnCana joint venture) Borger, TX N/A Refinery 2009 $300 mln debottleneck, boost
bitumen processing
54,000 bpd CDU 2012 Bitumen phase 3, $600 mln
*************************************************************************************
ROCKY MOUNTAINS (PADD 4)
*************************************************************************************
CONOCOPHILLIPS (COP.N)
Billings, MT 70,000 bpd CDU 2011 Replace existing CDU, capacity
up 7,000 bpd
-------------------------------------------------------------------------------------
HOLLY CORP (HOC.N) [ID:nN05301152]
Navajo, NM 16,000 bpd CDU Q1-09 Revamp. Delayed three months
15,000 bpd HCU Q1-09 $240 million total outlay
N/A CDU Q4-09 40,000 bpd heavy crude revamp ------------------------------------------------------------------------------------- SINCLAIR OIL CORPORATION Salt Lake, UT 60,000 bpd DCU 2009 ------------------------------------------------------------------------------------- TESORO CORP (TSO.N) Woods Cross, UT N/A GHT N/A $55 mln gasoline hydrotreater ************************************************************************************* WEST COAST (PADD 5) ************************************************************************************* CONOCOPHILLIPS CORP (COP.N) [ID:nN27462953], possible delay: [ID:nN28348458] Ferndale, WA 20,000 bpd DCU 2012 Adds 25,000 bpd heavy oil capacity
5,000 bpd CDU N/A Rodeo, CA 20,000 bpd HCU Q3-09
5,000 bpd CDU Q3-09
Los Angeles N/A DCU/FCC 2010 Revamp, clean yields up 2 percent
-------------------------------------------------------------------------------------
TESORO CORP (TSO.N)
Los Angeles N/A DCU 2012 Revamp
N/A DHT 2012 Revamp ************************************************************************************* KEY: FCC: Fluid Catalytic Cracker; CDU: Crude Distillation Unit; VDU: Vacuum Distillation Unit; DCU: Delayed Coker Unit; DHT: Distillate Hydrotreater; HTU: Hydrotreater; HCU: Hydrocracker; CCR: Catalytic Reformer; KHT: Kerosene Hydrotreater; GDS: Gasoline Desulphurization Unit; ALK: Alkylation unit ISE: Iso-Octene unit
© Thomson Reuters 2010 All rights reserved.


UK
US