TABLE-U.S. oil refinery expansion plans

Thu Feb 12, 2009 6:11pm GMT
 
Email | Print | | Single Page
[-] Text [+]

-------------------------------------------------------------------------------------
MOTIVAENTERPRISES LLC (RDSa.L) [ID:nN23314144]
Pt. Arthur, TX       45,000 bpd    DHT       2008   Construction began June 2006
                 325,000 bpd    Refinery  2010   $7 bln project approved
-------------------------------------------------------------------------------------
PASADENA REFINING SYSTEM INC.
Pasadena, TX                N/A    Refinery  2010   Revamp to run 70,000 bpd Marlim
                         N/A    CDU        N/A   Future 100-200,000 bpd expansion
-------------------------------------------------------------------------------------
PLACID REFINING COMPANY LLC
Port Allen, LA              N/A    FCC      Q2-08   Gasoline output to rise 7,000 bpd
                         N/A    CDU      Q3-08   Heavy oil revamp
                  25,000 bpd    CDU        N/A   Planned expansion
-------------------------------------------------------------------------------------
TOTAL SA (TOTF.PA) [ID:nL13709737]
Pt. Arthur, TX       50,000 bpd    DCU       2011   $2.2 bln heavy oil project
                         N/A    HDS       2011   N/A      
                                VDU       2011
-------------------------------------------------------------------------------------
VALERO ENERGY CORPORATION (VLO.N)
Pt. Arthur, TX       75,000 bpd    CDU       2010   Crude throughput expansion
                  45,000 bpd    DCU       2011   New coker
                  50,000 bpd    HCU       2010   New diesel hydrocracker
                         N/A    CGU       2012   $2.5 bln coke gasification unit
St Charles, LA       45,000 bpd    CDU       2010   $1.4 bln, board approved
                  10,000 bpd    DCU       2010   Coker expansion
                  50,000 bpd    HCU       2010   New hydrocracker
                         N/A    Aromatics 2012*  Proposed $2.1 bln aromatics plant
                                                 that would cut mogas output
-------------------------------------------------------------------------------------
WRB REFINING (ConocoPhillips and EnCana joint venture)
Borger, TX                  N/A    Refinery  2009   $300 mln debottleneck, boost
                                                 bitumen processing
                  54,000 bpd    CDU       2012   Bitumen phase 3, $600 mln
*************************************************************************************
ROCKY MOUNTAINS (PADD 4)
*************************************************************************************
CONOCOPHILLIPS (COP.N)
Billings, MT         70,000 bpd    CDU       2011   Replace existing CDU, capacity
                                                 up 7,000 bpd
-------------------------------------------------------------------------------------
HOLLY CORP (HOC.N) [ID:nN05301152]
Navajo, NM           16,000 bpd    CDU      Q1-09   Revamp. Delayed three months
                  15,000 bpd    HCU      Q1-09   $240 million total outlay
                         N/A    CDU      Q4-09   40,000 bpd heavy crude revamp
-------------------------------------------------------------------------------------
SINCLAIR OIL CORPORATION
Salt Lake, UT        60,000 bpd    DCU       2009
-------------------------------------------------------------------------------------
TESORO CORP (TSO.N)
Woods Cross, UT             N/A    GHT        N/A   $55 mln gasoline hydrotreater
*************************************************************************************
WEST COAST (PADD 5)
*************************************************************************************
CONOCOPHILLIPS CORP (COP.N) [ID:nN27462953], possible delay: [ID:nN28348458]
Ferndale, WA         20,000 bpd    DCU       2012   Adds 25,000 bpd heavy oil capacity
                   5,000 bpd    CDU        N/A
Rodeo, CA            20,000 bpd    HCU      Q3-09
                   5,000 bpd    CDU      Q3-09
Los Angeles                 N/A    DCU/FCC   2010   Revamp, clean yields up 2 percent
-------------------------------------------------------------------------------------
TESORO CORP (TSO.N)  
Los Angeles                 N/A    DCU       2012   Revamp
                         N/A    DHT       2012   Revamp
*************************************************************************************
KEY: FCC: Fluid Catalytic Cracker; CDU: Crude Distillation Unit; VDU: Vacuum Distillation
Unit; DCU: Delayed Coker Unit; DHT: Distillate Hydrotreater; HTU: Hydrotreater; HCU:
Hydrocracker; CCR: Catalytic Reformer; KHT: Kerosene Hydrotreater; GDS: Gasoline
Desulphurization Unit; ALK: Alkylation unit ISE: Iso-Octene unit

 

Market Update

  • UKUK
  • USUS
  • Europe
  • Asia
  • UK Most Actives

Most Popular Business News on Reuters UK

  • Articles
  • Videos