April 13, 2018 / 4:53 PM / 5 months ago

BRIEF-Duke Energy Ohio Moves Forward With Application Before OPSB To Construct Its Proposed Central Corridor Pipeline

April 13 (Reuters) - Duke Energy Corp:

* DUKE ENERGY OHIO IS MOVING FORWARD WITH APPLICATION BEFORE OHIO POWER SITING BOARD TO CONSTRUCT ITS PROPOSED CENTRAL CORRIDOR PIPELINE

* DUKE ENERGY OHIO IS PROPOSING OPSB RESCHEDULE ADJUDICATORY HEARING IN COLUMBUS FOR LATER THIS SPRING OR SUMMER Source text for Eikon: Further company coverage:

0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below