January 15, 2008 / 10:08 PM / 11 years ago

TABLE-U.S. refinery expansion plans (Marathon)

(Marathon update on refinery expansion projects in MI, LA & KY) REFINERY        CAPACITY     UNIT  COMPLETION ============================================================================= EAST COAST (PADD 1) ============================================================================= CONOCOPHILLIPS CORP. (COP.N) Bayway, NJ       5,800 bpd   FCC     N/A    Revamp, conversion up 4 percent
                          CDU     N/A    Revamp    SUNOCO INC. (SUN.N) Phila., PA      15,000 bpd+  FCC   Apr-07   Costs rose from $300 million to
                                         $520 million amid industry-wide
                                         cost pressures and design changes
          40-50,000 bpd   HDS   early-09 up to $275 million to convert an
                                         idle HCU to process heating oil
                                         into ultra-low sulphur diesel  VALERO CORP. (VLO.N) Del. City, DE  20,000 bpd    CDU     N/A    Company seeking permits ============================================================================= MIDWEST (PADD 2) ============================================================================= BP PLC (BP.L) Whiting, IN     N/A        refinery 2011    $3 billion revamp to increase
                                         heavy crude processing, motor
                                         fuels output to rise 55,000 bpd COFFEYVILLE RESOURCES Coffeyville, KS 15,000 bpd   CDU  late-06 FLINT HILLS RESOURCES Rosemount, MN   50,000 bpd   CDU   Q4-07
                N/A       DCU    N/A     Larger coker drums being installed FRONTIER OIL CORP. FTO.N El Dorado, KS       N/A    CDU/VDU Q2-08    $50 million heavy crude revamp
              2,500 bpd   DCU   Q2-08    Two new coker drums
              5,000 bpd   FCC   Q2-09    $78 million expansion
                          HTU   Q2-09    $77 million expansion MARATHON OIL CORP (MRO.N) Catlettsburg, KY    N/A    refinery N/A     NOT PURSUED CURRENTLY DUE TO COST
                                         150,000 bpd heavy oil project. Detroit, MI     15,000 bpd refinery 2010    $1.9 bln, expands refinery from
                                         100K to 115K, raise heavy oil
                                         processing by 80K. construction can
                                         start in March or April if air
                                         permit in place, complete late 2010 Robinson, IL        N/A    refinery N/A     NOT PURSUED CURRENTLY DUE TO COST
                                         180,000 bpd heavy oil project. MURPHY OIL CORP (MUR.N) Superior, WI        N/A    refinery N/A     Seeking Canadian oil sands partner
                                         for possible expansion SINCLAIR OIL CORP.  Tulsa, OK       45,000 bpd refinery 2010    $1 bln, seeking enviro permits SUNOCO Toledo, OH      20,000 bpd   CDU Jun-07     $40 million expansion, on budget
          10-15,000 bpd   HCU end-08     $30 million expansion
            20,000 bpd   CDU   2008     On hold due to costs
             24,000 bpd   FCC   2008     On hold due to costs WRB REFINING LLC (ConocoPhillips and EnCana joint venture) Wood River, IL  32,000 bpd   GDS   2007     S-Zorb unit
             70,000 bpd   CDU   2009     CDU, DCU projects are $1.9
             65,000 bpd   DCU   2009     billion first phase of oil sands
                 N/A    CDU/DCU 2013     Further 100,000 bpd bitumen
                                         $2 billion capital cost WYNNEWOOD REFINING (GARY-WILLIAMS ENERGY) Wynnewood, OK   15,000 bpd   CDU   Q1-07
             20,000 bpd   DHT    N/A ============================================================================= GULF COAST (PADD 3) ============================================================================= CHEVRON CORP. (CVX.N) Pascagoula, MS  16,000 bpd   FCC   Late-06  Completed December 2006
             14,285 bpd   CCR   mid 2010 $500 mln, construction
                                         to start in early 2008. Replaces
                                         two older reformers, boosts
                                         gasoline output by 14,285 bpd
            200,000 bpd refinery N/A     Decision seen 1H 2008. Applied for
                                         permits. Work seen in 2008, 2009 HOLLY CORP. HOC.N Navajo, NM      15,000 bpd   CDU   Q4-08    revamp
             20,000 bpd   HCU   Q4-08    $240 million total outlay
               N/A        CDU    2011    40,000 bpd heavy crude revamp MARATHON OIL CORP. (MRO.N) Garyville, LA  180,000 bpd   CDU   Q4-09    $3.2 billion expansion
             44,000 bpd   DCU   Q4-09  
             70,000 bpd   HCU   Q4-09
             65,000 bpd   CCR   Q4-09
             47,000 bpd   KHT   Q4-09 MOTIVA ENTERPRISES LLC (RDSa.L) Pt. Arthur, TX  45,000 bpd   DHT    2008    Construction began June 2006
            325,000 bpd refinery 2010    $7 bln project approved PASADENA REFINING SYSTEM INC. Pasadena, TX      N/A    refinery   2010    revamp to run 70,000 bpd Marlim
               N/A        CDU     N/A    future 100-200,000 bpd expansion PLACID REFINING COMPANY LLC Port Allen, LA    N/A        FCC   Q2-08    Gasoline output increased 7,000 bpd
               N/A        CDU   Q3-08    Heavy oil revamp
             25,000 bpd   CDU     N/A    Planned expansion TOTAL SA (TOTF.PA) Pt. Arthur, TX    N/A        DCU    2009    $1 billion project studied VALERO ENERGY CORP. (VLO.N) C. Christi, TX      N/A      ISE    Q2-07   MTBE unit conversion Houston, TX         N/A      HCU    Q2-07   Mild hydrocracker   Pt. Arthur, TX  75,000 bpd   CDU    Q1-07   completed and in operation
            125,000 bpd refinery  2009   $1.3 billion project, engineering
                                         underway, not yet sanctioned St Charles, LA  45,000 bpd   CDU     2010   $1.4 bln, board approved
             10,000 bpd   coker
             50,000 bpd   HCU Tx. City, TX    20,000 bpd   CDU     N/A    Expansion canceled on costs
             12,000 bpd   DCU     N/A    Expansion canceled on costs WRB REFINING LLC Borger, TX      20,000 bpd   DCU   Q2-07    Bitumen phase 1, $500 million
         debottleneck  refinery 2009    Bitumen phase 2, $300 million
             54,000 bpd   CDU    2012    Bitumen phase 3, $600 million ============================================================================= ROCKY MOUNTAINS (PADD 4) ============================================================================= CONOCOPHILLIPS Billings, MT    10,000 bpd CDU/VDU Q2-07    Heavy crude capacity up 46,000 bpd FRONTIER Cheyenne, WY     4,500 bpd   DCU    Q3-07   $89 million expansion
              N/A         CDU    Q2-07   $8 million revamp HOLLY Woods Cross, UT  5,000 bpd   CDU    Q4-08
             15,000 bpd   HCU    Q4-08   $100 million for both projects SINCLAIR   Salt Lake, UT   60,000 bpd   DCU    2009 Sinclair, WY    20,000 bpd   CDU   late-06
             20,000 bpd   DCU   late-06  coker purchased from idle refinery ============================================================================= WEST COAST (PADD 5) ============================================================================= BIG WEST OIL LLC Bakersfield, CA 19,200 bpd   FCC    2008    $680 million conversion capacity
             25,000 bpd   DHT    2008    project to double CARB diesel and
              9,000 bpd   ALK    2008    gasoline output. CHS INC. (CHSCP.O) Laurel, MT      15,000 bpd   DCU   Aug-08   $325 million CONOCOPHILLIPS Ferndale, WA    25,000 bpd   DCU     N/A    Adds 25,000 bpd heavy oil capacity
              5,000 bpd   CDU     N/A Rodeo, CA       20,000 bpd   HCU
              5,000 bpd   CDU Los Angeles        N/A       DCU    N/A/    Revamp, clean yields up 2 percent TESORO CORP. TSO.N   Los Angeles       N/A        DCU    N/A     revamp
               N/A        DHT    N/A     revamp Martinez, CA      N/A        DCU    N/A     Conversion of existing fluid
                                         coker,costs as high as $525
                                         million from $275 million initial
                                         estimate Anacortes, WA   25,000 bpd   DCU            cancelled July 2006 on costs
              N/A                        refinery H2-07
                                         $34 million sour crude revamp VALERO Benicia, CA      N/A         DHT    Q3-07   ULSD unit, $105 million Wilmington, CA   N/A         ALK    Q4-07   $195 million project ============================================================================= PERMITS PENDING MARATHON
 Canton, OH    Diesel hydrotreater      waiting for air permits MOTIVA
 Norco, LA    Modification of hydrocracking unit     Feb 7 2008 KEY: FCC: Fluid Catalytic Cracker; CDU: Crude Distillation Unit; VDU: Vacuum Distillation Unit; DCU: Delayed Coker Unit; DHT: Distillate Hydrotreater; HTU: Hydrotreater; HCU: Hydrocracker; CCR: Catalytic Reformer; KHT: Kerosene Hydrotreater; GDS: Gasoline Desulphurization Unit; ALK: Alkylation unit ISE: Iso-Octene unit  

0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below