August 24, 2018 / 7:05 AM / a month ago

LNG tanker Patris due to load at Rotterdam on Sept. 7

OSLO, Aug 24 (Reuters) - The liquefied natural gas (LNG) tanker Patris is due to arrive and load at the Dutch port of Rotterdam on Sep. 7, Reuters shipping data showed.

The tanker, which has a capacity of about 174,000 cubic metres of gas, is arriving from Panama. (Reporting by Lefteris Karagiannopoulos; Editing by Mark Potter)

0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below