    Sept 8 (Reuters) - The following table lists maintenance outages and unscheduled stoppages
at Swiss nuclear power plants.

Maintenance usually takes place in the spring and summer.

Ownership of the plants is detailed under (1,2,3...)
    
Please click on the link at the bottom to access the data.

New content is marked***
    
                                                                
 REACTOR NAME               CAPACITY  TIME PERIOD               OPERATOR
                            (MW)                                
 CURRENT OUTAGES                                                
 Beznau 1                   365       Mar 13, 2015-Oct 31,      Axpo (1)
                                      2017                      
 Muehleberg                 355       Aug 13-Sept 8             BKW-FMB (4)***
 Beznau 2                   365       Aug 18-Sep 24             Axpo (1)
 Leibstadt                  1,245     Aug 19-Sept 18, cut by    Alpiq (3)
                                      120 MW                    
                                                                
 FUTURE OUTAGES /LOAD CUTS                                      
 Leibstadt                  1,245     Sep 18-Nov 7 full outage  Alpiq (3)
                                                                
 COMPLETED OUTAGES                                              
 Leibstadt                  1,245     May 20-Aug 19 load cut    Alpiq (3)
                                      by 120 MW, on Aug 19 cut  
                                      by 320 MW                 
 Goesgen                    970       Jul 27                    Alpiq (2)
 Beznau 2                   365       Aug 4-7                   Axpo (1)
 Goesgen                    970       Jul 24, Jun 4-29          Alpiq (2)
 Leibstadt                  1,245     Drop by 320 MW intraday   Alpiq (3)
                                      on May 20                 
 Muehleberg                 355       May 11, Mar 9 load cuts   BKW-FMB (4)
 Leibstadt                  1,245     Feb 18-20, Aug 2-Feb 17   Alpiq (3)
                                                                
                                                                
 Source: here
    
1) Axpo AG (formlery NOK) is part of the Axpo Holding which is 100% in public hands and also
consists of Centralschweizerische Kraftwerke AG (CKW) and EGL AG.

2) Alpiq (40%), Axpo (25%), Zurich city (15%), CKW (12.5%), Energie Wasser Bern (ewb) (7.5%)

3) KKL is the operator, of which Alpiq AG (27.4%), Alpiq Suisse SA (5%), Axpo AG (22.8%), EGL AG
(16.3%), CKW (13.6%), BKW FMB Beteiligungen AG (9.5%), AEW Energie AG (5.4%)

4) Canton Berne (52.54%), EAG (10%), E.ON Energie (7.03%), BKW FMB (9.99%), others (20.44%)

 (Reporting by Vera Eckert in Frankfurt)
  

Our Standards:The Thomson Reuters Trust Principles.
0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below