(Leibstadt started full four-week outage Sept 17) Sept 18 (Reuters) - The following table lists maintenance outages and unscheduled stoppages at Swiss nuclear power plants. Maintenance usually takes place in the spring and summer. Ownership of the plants is detailed under (1,2,3...) Please click on the link at 8the bottom to access the data. REACTOR NAME CAPACITY TIME PERIOD OPERATOR (MW) CURRENT, ONGOING OUTAGES/LOAD DROPS Leibstadt 1,245 Sep 17-Oct 13 (full), v Alpiq (3)*** small cuts thereafter to Jun 3, 2019 COMPLETED OUTAGES, LOAD CUTS IN 2018 Muehleberg 355 Aug 19-Sep 13 BKW-FMB (4) Goesgen 970 Apr 10, Jun 2-23 Alpiq (2) Beznau 1 365 Mar 13, 2015-Mar 19, Axpo (1) 2018, May 2-15, Aug 19 Muehleberg 355 online after Mar 7 BKW-FMW (4) stoppage, May 17 at half load for 3 hrs Beznau 2 365 Jun 9-25 (partial), Jun Axpo (1) 26-Jul 10 (full) Leibstadt 1,245 Load cuts by 170 MW Alpiq (3) carried on from last outage, which ended Dec 22, ran through to Sept 17 Source: here 1) Axpo AG (formlery NOK) is part of the Axpo Holding which is 100% in public hands and also consists of Centralschweizerische Kraftwerke AG (CKW) and EGL AG. 2) Alpiq (40%), Axpo (25%), Zurich city (15%), CKW (12.5%), Energie Wasser Bern (ewb) (7.5%) 3) KKL is the operator, of which Alpiq AG (27.4%), Alpiq Suisse SA (5%), Axpo AG (22.8%), EGL AG (16.3%), CKW (13.6%), BKW FMB Beteiligungen AG (9.5%), AEW Energie AG (5.4%) 4) Canton Berne (52.54%), EAG (10%), E.ON Energie (7.03%), BKW FMB (9.99%), others (20.44%) (Reporting by Vera Eckert in Frankfurt)